Featured projects



21.05.15



Silicon Valley Berryessa Extension (SVBX)



The SVBX project is the extension of the Bay Area Rapid Transit (BART) from Fremont, CA to San Jose. This project was a 10 mile railroad relocation and right-of-way (ROW) development project that had seven waterways and thirteen bridges, or under-crossings, associated with it.

Ally Rail staff worked on this project from the 10% design phase to the inspection of the trackwork insulation, for over 10 years. Our main duties, as they evolved with the project phases, design review, included crossing development, utility relocations, Union Pacific Railroad track relocation coordination and negotiations, Roadway Worker Protection (RWP), project oversight,.. among many, many, other duties from 2005 until 2016.

Project cost: $780m+*



21.05.15



La Selva Bridge replacement, Santa Cruz, CA



The La Selva Bridge replacement was an approximately 350' bridge replacement on the Santa Cruz Branch rail line. The project replaced a 1927 steel tower bridge with a modern steel bridge. Ally Rail staff provided construction and bridge inspection services.

Project Cost: $5m*



21.05.15



Newhall Yard track removal, San Jose, CA



The Newhall Yard was a track removal, yard cleanup and contaminated soil removal project associated with the Silicon Valley Rapid Transit (SVRT) project. The project was executed for a future BART rail yard. The project removed several thousand feet of yard track, numerous piles of used ties and several thousand cubic yards of contaminated soil.

Ally Rail staff monitored progress, safety conditions and general inspection.

Project cost: $2m.*



21.05.15



Mountain View LRT Double Track



The Mountain View Light Rail (LRT) Transit Double Track project was a one mile track installation, with several turnouts, and a overhead catenary system (OCS). The construction was sandwiched between the VTA's existing light rail transit (LRT) system and the Caltrain right-of-way, both with commuter train schedules. This presented many challenges limited work windows, limited working space, complex utilities relocations and installations, and multiple agency coordination and restrictions. The complications, and the proximity of VTA LRT and Caltrain, limited the work to mostly nighttime hours. However, this added the complexity noise restrictions, because of nearby residences. Additionally, the project was on a hard completion date, to accommodate the added ridership on the VTA LRT from Superbowl 50.
Ally Rail staff helped monitor, inspect and coordinate the work, including safety.
Project Cost: $35m.*



21.05.15



VTA Pocket Track Project



The VTA Pocket Track Project was the installation of 1/2 mile of track, six turnouts, including a double crossover. This project was implemented to increase the train capacity at the new San Francisco 49rs Levi stadium.

Ally Rail staff provided track and overhead catenary system (OCS) inspection.*



21.05.15



Eagle Mountain Railroad



The Eagle Mountain Railroad is a out-of-service fifty mile long privately owned railroad located in Southern California. It was connected to the Union Pacific Yuma Subdivision line and ends at an abandoned iron ore mine.

Ally Rail staff created an assessment of the track, bridges and culverts conditions for possible rehabilitation.*



* Projects not associated with Ally Rail, but with staff.